InferenceUpdated 26 Aug 2026

Missouri (second site)

Independence, MO, United States

Status

Possible

Contracted

n/a MW

Live

n/a MW

Build estimate

n/a

Not announced. The company's own site list names Missouri alongside Kansas City, which is itself in Missouri — suggesting a second location — and site-operations roles have been posted in Independence, MO. It could equally be a loose reference to the same campus. Treat as weak evidence.

Primary record: Inferred: Missouri listed separately from Kansas City in the Q2 2026 site map
Loading map

Milestones and evidence

26 Aug 2026

Missouri (second site) recorded as a possible location

Target or inference

Not announced. The company's own site list names Missouri alongside Kansas City, which is itself in Missouri — suggesting a second location — and site-operations roles have been posted in Independence, MO. It could equally be a loose reference to the same campus. Treat as weak evidence.

Inferred: Missouri listed separately from Kansas City in the Q2 2026 site map

Hiring history

CSV

No matching data center hiring observation is stored for this location. This does not mean the site has no staff.